111) Solarsahihe.com site survey me kya-kya check karta hai?
Solarsahihe.com site survey me roof area measurement, shading (tree/adjacent building), roof type (RCC/tin), orientation/tilt feasibility, cable routing, earthing feasibility, inverter placement aur safety clearances check karta hai. Is survey ka output ek practical design hota hai jo long-term generation aur safety dono optimize karta hai.

Extra Details

  • Shading report se layout finalize hota hai.
  • Structure selection roof type aur wind zone ke hisaab se hoti hai.
  • Compliance (net metering) ke liye meter/DB location mapping hoti hai.
Keyword: Solar Site Survey
112) Rooftop solar install karne ke liye kya documents chahiye hote hain?
Documents generally consumer category (residential/commercial), DISCOM process aur scheme par depend karte hain. Usually ID proof, electricity bill, roof ownership/authorization, application forms, bank details (subsidy/settlement) aur technical documents (SLD, datasheets) required ho sakte hain. Solarsahihe.com aapko exact checklist process ke start me provide karta hai.

Extra Details

  • Net metering me SLD + inverter/panel compliance important hoti hai.
  • Subsidy case me portal-based KYC/verification steps ho sakte hain.
  • Commercial sites me additional approvals possible.
Keyword: Solar Documents
113) Solar plant me fire risk kaise prevent hota hai?
Fire risk mainly poor crimping, loose terminations, wrong cable sizing, cheap connectors, and improper protection devices se badhta hai. Prevention ke liye quality DC connectors, correct lugs/crimping, proper MCB/MCCB, SPD, earthing aur periodic inspection essential hai. Solarsahihe.com installation standards me safety-first routing aur protection mandatory rakhta hai.

Extra Details

  • Hot joints avoid: torque-tightening + periodic re-check.
  • Cable dressing UV resistant + proper conduit/clamps.
  • Clearances maintain for heat dissipation.
Keyword: Solar Safety
114) Net metering me monthly settlement kaise hoti hai?
Net metering me meter import (grid se liya) aur export (grid me diya) units record karta hai. Bill me generally net units ya policy-defined adjustment hota hai. Kuch cases me monthly adjustment aur annual settlement rules follow hote hain. Solarsahihe.com aapko aapke DISCOM policy ke according bill reading samjhata hai.

Extra Details

  • Self-consumption maximize = best savings.
  • Export credits rules DISCOM ke hisaab se vary karte hain.
  • Fixed charges usually continue rehte hain.
Keyword: Net Metering Billing
115) Inverter ko kahan install karna best hota hai?
Inverter placement aisi jagah hona chahiye jahan ventilation good ho, direct rain/sun exposure limited ho, aur cable length optimal ho. Dusty/humid environments me enclosure/placement planning important hoti hai. Solarsahihe.com inverter placement ko safety + performance + maintenance ease ke basis par decide karta hai.

Extra Details

  • Heat high = efficiency drop / fault risk.
  • Service access clear space maintain karein.
  • AC DB near placement cable losses reduce karta hai.
Keyword: Solar Inverter Installation

Frequently Asked Questions – Solarsahihe.com

Rooftop Solar System, Net Metering, Solar Subsidy, Solar Inverter, Solar Battery, Installation, Cost & ROI — detailed answers by Solarsahihe.com.

All
Basics
Net Metering
Subsidy
Inverter
Battery
ROI
Maintenance
Safety
Commercial
Showing: 0 / 0